What plug-in solar is, and how it works
A plug-in solar system is one or two solar panels and a microinverter that connect to your home through an ordinary wall outlet. It feeds power into your home's circuits, so you buy less from the grid while the sun is up.
The parts
- Panels. Usually one or two, mounted on a balcony railing, a patio, a fence or the ground.
- A microinverter. It turns the panels' direct current into household alternating current. Its AC output rating is the number state watt caps usually apply to; Vermont's law, for example, caps the combined inverter capacity.
- A plug and cord. The inverter connects to a standard outlet, often an outdoor GFCI outlet.
- Sometimes a battery. Some systems, such as EcoFlow's STREAM Ultra, add a battery so solar made at noon can be used in the evening.
Why it doesn't shock anyone when the power goes out
The laws passed so far require the device to stop sending power when the grid goes down, so it cannot energise lines a utility crew is working on. California's and Vermont's laws, for example, require automatic shutdown during an outage. Vermont's also requires a UL 3700 listing or an equivalent from a nationally recognised testing laboratory. UL 3700 is the safety standard written for plug-in solar systems.
Where the power goes
The power is used by whatever is running in your home at that moment: the fridge, a router, a computer. The laws so far are written for systems that offset your own use, not for selling power. Vermont's law says exports are not paid for, and Virginia's excludes these devices from net metering.
What the laws change
Without a law, a system that connects to your home wiring falls under your utility's interconnection rules, the same paperwork written for rooftop arrays. The 10 state laws signed so far replace that with a short notice to the utility, or with nothing at all, for systems under a set size:
| State | Watt cap | What your utility gets |
|---|---|---|
| California | 1,200 W | Exempt from utility interconnection rules. Utilities may not charge a fee or require permission before you plug in. Devices offset your own use only; export rules are unchanged. |
| Colorado | 1,920 W | Utilities may not require approval before you install or use a qualifying device. |
| Connecticut | 1,200 W | Utilities may not charge a fee or require prior approval. |
| Maine | 1,200 W | Systems of 420 W or less may be installed yourself with no utility notice. Systems above 420 W and up to 1,200 W need a licensed electrician and a utility notice within 30 days. |
| Maryland | 1,200 W | Utilities may not require approval before installation. |
| New Hampshire | 1,200 W | Utilities may not charge a fee or require prior approval. |
| New Jersey | 1,200 W | Exempt from utility interconnection and metering requirements, including fees, approvals and equipment mandates. |
| Utah | 1,200 W | Utilities may not charge a fee or require prior approval for a qualifying device. |
| Vermont | 1,200 W | No utility approval, fee or interconnection agreement. One device per electric meter, and only where the home has a smart meter. A net-metering customer may not add one, and exports are not paid for. |
| Virginia | 1,200 W | From January 1, 2027 you notify your utility before installing, using the State Corporation Commission's device notification form. The utility may not impose interconnection requirements, charge a fee, or require prior approval. |
Before you buy
- Check your state's page for the cap and any notice you must give.
- Match the kit's inverter output, not just the panel wattage, to that cap.
- Look for the safety listing your state names.
- If you rent, read the renter rules for your state. Some laws protect tenants, and others say nothing about them.